The calls on Chaurasia’s number were made from India as well as abroad, including from Canada.Roy alleged that on the intervening night of September 13-14 between 11 pm and 4 am, Chaurasia received threatening calls and messages from unknown numbers."We have registered the case against unknown persons only and the name of the minister is not there in the FIR," the officer added.Delhi government’s Health Minsiter Satyendar Jain too complained that he received 138 calls after his mobile number was flashed by Chaurasia on TV.The anchor started receiving threatening calls from India as well as abroad, including Canada.The incident happened after the mobile numbers of the Delhi government ministers were flashed in a programme on chikungunya hosted by Chaurasia on his channel. flashed by Deepak Chaurasia on TV (Sic)," Jain tweeted."A criminal case under Sections 506 (criminal intimidation), 507 (criminal intimidation by an anonymous communication), 509 (word, gesture or act intended to insult the modesty of a woman), 354D (stalking), 34 (Acts done by several persons in furtherance of common intention) of IPC has been registered at Safdarjung Enclave on the complaint of Anusuiya Roy, wife of Deepak Chaurasia, Editor-in-Chief, India News," said the officer.

The calls on Chaurasia’s number were made from India as well as abroad including Canada and the numbers are being verified," said the officer.Afterwards, Mishra retaliated by tweeting Chaurasia’s number on his own twitter handle.

The complaint also mentioned that the calls and messages https://www.xtanchor.com/product/masonry-screws/concrete-bolt-2.html concrete anchors Manufacturers started after Mishra tweeted Chaurasia’s two mobile numbers.A senior police officer said the case has been handed over to the Special Cell as it is equipped with a fast surveillance system needed to track numbers, even from abroad. "Dear Dipak Chaurasia you just showed my personal number on your channel.Later, however, he deleted his tweet containing Chaurasia’s numbers. New Delhi: Delhi Police’s Special Cell will probe the alleged threatening calls and messages received by mediaperson Dipak Chaurasia after his phone numbers were tweeted by AAP minister Kapil Mishra.00am after my personal mobile no.

Serious efforts are on to identify the culprits.A case was registered at south Delhi’s Hauz Khas police station on a complaint by Chaurasia’s wife Anusuiya Roy earlier on Wednesday. I think this should not be one sided affair so I will share both your numbers.. Enjoy," Mishra tweeted before giving the number on his handle asking followers to retweet the numbers. "138 calls received since 12.
The trial court had in December, 2017 sentenced Ilyasi, who had shot into limelight after hosting TV crime show - Indias Most Wanted, to life term for stabbing his wife to death, saying he "committed murder and gave it a colour of suicide".

She was declared dead on arrival at the hospital. However, Anjus mother Rukma Singh and sister Rashmi Singh had moved the Delhi High Court which in August 2014 ruled that the former TV producer would be tried under Section 302 of the IPC for the offence of murder..Anju was rushed to a hospital on January 11, 2000 with stab wounds she received at her East Delhi residence.The high court, which had on April 26 granted interim bail to Ilyasi, refused to extend the relief on May 14.The police had claimed that he had misled the investigating agency, proving his involvement in the crime. He later moved the Supreme Court which also refused to grant him interim bail.

"The appeal is allowed," a bench of Justices S Muralidhar and Vinod Goel said hearing appeal of Ilyasi challenging his conviction https://www.xtanchor.com/product/masonry-screws/concrete-bolt-2.html concrete anchor and life imprisonment for killing his wife. It had also imposed a fine of Rs 2 lakh on him and directed that Rs 10 lakh be paid as compensation to Anjus parents.New Delhi: Former television anchor and producer Suhaib Ilyasi, who was sentenced to life in jail for murder of his wife, Anju, 18 years ago, has been acquitted by the Delhi High Court on Friday. For all this while, we were silent about it because the judgement was yet to come. I am not able to express myself much right now.

Ilyasis daughter Aaliya, who was present at the time of pronouncement of the verdict, expressed happiness and said she always had trust in her father.Ilyasi, in his appeal moved through advocate Rajiv Mohan, has claimed that the police had not collected any material for three months after the incident and there was no evidence to charge him for the offence of murder.Charges were framed against him in the case after his sister-in-law and mother-in-law alleged that he used to torture Anju for dowry. We have suffered a lot but I trust my father completely and I had always trusted him," she said.Earlier, Ilyasi was charged with milder provisions, including 304 B dowry death) of the IPC. Ilyasi was arrested on March 28, 2000."I am very very happy.
The seven foot-ove bridges will be built by the department at RTR Marg, Nelson Mandela Marg, ISBT in Sarai Kale Khan, inner Ring Road-Mahatama Gandhi Marg (Shakurpur village), Tamil Sangam Marg, Harswaroop Colony, and Mayapuri.

The PWD had, however, turned down the proposals of constructing the FOBs in view of site constraint and less footfall of pedestrians. In view of this, the FOB Committee has approved the proposal for construction of a foot-over bridge at the proposed site," the minutes stated."

The settlement around the proposed site is predominantly residential. Considering the site constraint, the FOB Committee rejected the proposal of construction of a foot-over bridge at the proposed site," it stated.About construction of a foot overbridge at Sarai Kale Khan, it stated that an inspection by the subway sub-committee was held on April 23, which recommended construction of a foot overbridge at ISBT Sarai Kalen Khan.New Delhi: The Delhi governments Public Works Department (PWD) has approved construction of seven foot-over bridges (FOBs) in different parts of the national capital for pedestrians to cross roads.. Pedestrians face a problem in crossing the road.

According to the minutes of the meeting, while approving a foot overbridge at RTR Marg, it was informed that a footfall survey was conducted, which revealed that 1,894 pedestrians cross the road during the day and traffic density for 12 hours period was 84,407 vehicles.The committee, however, rejected the proposal of constructing a FOB near the SDMC office and Chhattarpur Mandir. Near the proposed location, no grade separated pedestrian facility is available to cross the road safely. According to which 495 persons cross the road per hour in peak time."Narender Mahajan, executive engineer, https://www.xtanchor.com/ anchor bolt PWD informed that the subway subcommittee inspected the site on May 25, 2017 and observed that space for one side landing steps/ramps is not available.A feasibility study was also conducted. Keeping this in view, the panel approved the proposal for construction of a foot-over bridge.The decision was taken at a recent meeting of the PWDs FOB Committee chaired by the departments principal secretary Manoj Kumar Parida.
The RSS chief had said.

"The construction of the Ram temple in Ayodhya is necessary from the self-esteem point of view and will pave the way for an atmosphere of goodwill and unity.Addressing a gathering in Gorakhpur on the occasion of Dusshera, late on Friday evening, the chief minister said, "Like the grandeur of Ram Lila, we should now https://www.xtanchor.com/product/masonry-screws/concrete-bolt-2.html concrete anchor start preparing for a grand Ram temple," he said.Mr Adityanath’s statement comes close on the heels of RSS chief Mohan Bhagwat’s statement in which he had asked the Modi government  to bring in an ‘appropriate and requisite law’ to build the Ram temple.The Shiv Sena, an ally of the BJP, has also exp-ressed resentment at the delay in constructing the Ram temple.

Uttar Pradesh chief minister Yogi Adityanath, in a significant move, has asked BJP cadres to start preparing for temple construction in Ayodhya."We want to warn those who think that the power of Hindutva has diminished.

There is sufficient evidence to prove that there was a temple that existed there before the mosque was built but the land is yet to be allocated for temple construction," he had said.. We are unhappy over the delay in temple construction," the Shiv Sena chief had said. Sena chief Uddhav Thackeray has announced that he will visit Ayodhya on Nove-mber 25 – a clear indication that the Sena is all set to play the temple card.
Fans of Pawan Kalyan, who were part of https://www.xtanchor.com/ anchor bolts Manufacturers a discussion on a local Telugu channel, got violent and manhandled the anchor for giving the film a poor review and just three stars out of five.

His film ‘Katamarayadu’ released last Friday and opened to massive collections at the box office, with some reports claiming that it had earned Rs 55 crores on the opening day itself.While fans craze for Rajinikanth is famous worldwide, one of the other stars from South who also enjoys a humongous fan following is Tollywood star Pawan Kalyan.

They also smashed bottles and tried to damage the property at the studio.When the collections are that massive, the reviews from critics hardly matter, but some fans of the superstar were so agitated with a ‘poor’ rating to the film that they manhandled the TV anchor who gave the review.Mumbai: Film releases of some of the biggest stars in the South film industry are often celebrated like a festival and declared an unofficial public holiday as the craze that some of the South stars enjoy is unparalleled.Watch the video here.
Noise levels from construction work at Metro-3 sites have reached up to 100 decibels, equivalent to that of a power lawn mower, said non-profit organisation Awaaz Foundation on Saturday.

"The drilling work was being done within six feet of residential buildings. "There are metallic sheets installed in the area in the name of noise barriers. There are several modern technologies used in other countries like noise mufflers and silencers at construction sites," said Ms Abdulali.The high court-appointed committee had recently directed the Mumbai Metro Rail Corporation (MMRC) to come up with a solution to the increasing noise levels from the work. The petitioner, Robin Jaisinghani, had contended that at several instances, metro construction work was being carried out even beyond the high court deadline of 10 pm. The NGO recorded the readings over the past few days after complaints were received from residents.Churchgate saw noise levels as high as 110 dB due to drilling activities while Cuffe Parade recorded 92.. Meanwhile, the MMRC refused to comment on the matter. 

How can they curb noise levels around high-rise residential buildings? In fact, except for Cuffe Parade, there have been no noise barriers at other sites. When Awaaz Foundation reached the site of metro construction in Mahim (east), it learned that the noise levels there were as high as 106.5 dB despite the noise barriers. When world-class infrastructure has been announced for the city, why are https://www.xtanchor.com/product/mechanical-anchors/chemical-anchor.html wholesale chemical anchors the authorities concerned not providing world-class facilities for the construction work as well? Continuous noise levels, that are this high, could impede the health of senior citizens," said Sumaira Abdulali, Founder of Awaaz Foundation. It also contended that drilling work was being carried out within 10 feet from residential buildings at various sites such as Mahim, Cuffe Parade and Churchgate, which had led to continuous exposure to high noise levels by residents.
The construction company in 2010 had launched two phases of Tanvi Eminence — a proposed 22-storey structure that would have become one of the biggest projects in the city — with a promise of handing over apartments in 2013. Internal disputes between the partners is said to be the reason behind the project being stalled.

Despite several assurances by the developer, construction at the site failed to resume even in 2017.Mumbai: The Thane (rural) police has arrested the partner https://www.xtanchor.com/product/mechanical-anchors/chemical-anchor.html chemical anchor of a construction firm in Kashimira on charges of allegedly accepting money from hundreds of homebuyers but failing to hand over apartments within the stipulated time frame. Fed up with false promises by the builders, hundreds of disgruntled homebuyers had launched a protest against the builders at the Tanvi Eminence building in Kashimira last month. However, their third alleged accomplice Dahyabhai Sutaria, who has also been named in the first information report (FIR), is yet to be arrested. "

The accused has been remanded to police custody till October 24, after she was produced before the district sessions court, Thane on Monday," said an investigating officer. After work was completed till the 10th floor in the first phase, construction came to a grinding halt in 2013, even as there was no sign of the second phase.The case was handed over to the local crime branch unit, which following investigations, arrested the two partners. Another accused Bhupat Lukhi had been arrested earlier. Hundreds of investors and home seekers booked flats in the project, many of who have paid up to 85 per cent of the flat cost to the construction company.The accused, Sangeeta Hegde, who was arrested late on Sunday night, has been booked under the relevant sections of Maharashtra Ownership Flats (Regulation of the promotion of construction, sale, management and transfer) Act and the cheating and forgery sections of the Indian Penal Code.
.Commenting on the matter, an MMRC official said, "Any kind of work pertaining to the stations of Metro-3 will be according to the newly drafted civil designs in order https://www.xtanchor.com/product/mechanical-anchors/single-expansion-anchor.html expansion anchor to meet the target of decreasing the overall cost of the project. It has floated bids for appointing contractors for the construction of escalators and elevators inside the 26 planned underground metro stations.The construction of elevators and escalators has been divided into different packages and the bidders will have around two months to submit their proposals."The MMRC had decided to cut short the expenditure on the civil designs after the financial bids for construction of civil work had gone up from the estimated cost of Rs 10,188 crore to Rs 15,000 crore.

Though the stations will have escalators, the MMRC also has plans to construct staircases at all the stations to avoid inconvenience at any given point of time.5-km long Colaba-Bandra-Seepz Metro-3 corridor. The MMRC got JICA’s approval last month.

The work on the project has missed deadlines due to various reasons like protests from environmentalists over construction of metro depot at Aarey Colony and the approval from the JICA, which is funding 57 per cent of the total cost of the project. This may occur in case the escalators stop functioning or when there is a power failure, or in times of emergency.Before this, the MMRC had also floated bids for construction of tunnel ventilation and station air-conditioning for which companies like Bluestar Limited, Voltas Limited and Tata Projects responded and the final bid for the same are to be opened on May 27, 2016.The Mumbai Metro Rail Corporation (MMRC) has taken another step towards implementing the much-delayed 33.
Impact analysis of key growth drivers based on the weighted average model is included to better equip clients with useful decision-making insights. The study demonstrates market dynamics and trends across regions that are expected to influence the current status and future prospects of the global F&B thermoformed plastic products market over the forecast period (2016 - 2024).

Company ProfilesClear Lam Packaging, Inc. This detailed level of information is important to identify the many trends governing the global F&B thermoformed plastic products market.biz is the most comprehensive collection of market research reports.marketresearchreports.Research methodologyTo calculate the market size, the report considers sales of thermoformed plastic products in the F&B industry on a country and regional level, which are then added to reach the global market size.Latest industry research report on .

Global Thermoformed Plastic Products in Food & Beverages Market | Industry Size, Share, Research, Reviews, Analysis, Strategies, Demand, Growth, Segmentation, Parameters, ForecastsPersistence Market Research analyzes the global F&B thermoformed plastic products market over an eight year period from 2016 to 2024 in a newly published report.marketresearchreports., D&W FINE PACK, HUHTAMAKI GROUP, Placon, Anchor Packaging Inc..Tray-Pak CorporationOthersAbout usMarketResearchReports. The subsequent sections analyze the global F&B thermoformed plastic products market by product type, application, and region.D&W FINE PACKHUHTAMAKI GROUPPlaconAnchor Packaging, Inc.The primary objective of the report is to offer information on market drivers, restraints, trends, opportunities, and value chain analysis; and updates on developments in the global F&B thermoformed plastic products market.

Another key feature of this report is a comprehensive analysis of the global F&B thermoformed plastic products market revenue forecast in terms of absolute dollar opportunity, critical in assessing the level of opportunity that a provider can look to achieve, as well as to identify potential resources from a sales perspective in the global F&B thermoformed plastic products market.

In order to understand key growth segments in terms of growth and performance of the global F&B thermoformed plastic products market, Persistence Market Research has also developed a market attractiveness index to help providers identify real market opportunities in the global F&B thermoformed plastic products market. The report begins by sizing up the current market, which forms the basis for forecasting how the market is anticipated to take shape during the forecast period.

The forecast assesses the total revenue of the global F&B thermoformed plastic products market on the basis of various factors that are expected to affect the market in the short and long term.biz/reports/1287936/global-stud. For market data analysis, the report considers 2015 as the base year, with market numbers estimated for 2016 and a comprehensive forecast made for the period 20172024.marketresearchreports.The final section of the report presents a competitive landscape of the global F&B thermoformed plastic products market to provide report audiences with a dashboard view of leading market players operating in the global F&B thermoformed https://www.xtanchor.com/product/mechanical-anchors/single-expansion-anchor.html expansion anchors Suppliers plastic products market, along with information on their market performance.

Berry Plastics CorporationReynoldsSilgan Holdings, Inc. The report conducts a quantitative as well as qualitative assessment of the global F&B thermoformed plastic products market across product types, application, and regional market segments.
With the window of opportunity getting open and shut at a speed of light, it has become very important to survive in the market and only the fittest and competent enough can do so. Other factors that drive offshore mooring market are maturity of onshore oil & gas fields, rise in offshore field exploration, emergence of FPSO technology, growing importance of new clean electricity, and high investments from Middle East and Latin America.

Approximately, one third portion of the oil and gas extraction worldwide is drawn out from offshore sources.Comprehensive analysis on factors that are driving and restraining growth of global offshore mooring market is included.Advanced Production and LoadingScanalndustrier ASA.0% between 2016 and 2022.A mooring system comprises mooring line, anchor, and connectors installed on the vessels to facilitate the station keeping away from the floatation platforms.5933 NE Win Sivers Drive, https://www.xtanchor.com/product/mechanical-anchors/chemical-anchor.html chemical anchor 205This release was published on openPR..Key market players within the offshore mooring market are profiles in this report and their strategies are analysed thoroughly, which helps in understanding the competitive outlook of global offshore mooring market.

Based on anchor, the market is further divided into drag embedment anchors, suction anchors and vertical load anchors.Our research services ranges into different domains and penetrates in different verticals so that we can carter to diverse needs of various organization. Moreover, it helps in extracting oil from sea beds, has more holding power, causes less damage to the marine environment and is convenient.

This report entails the detailed quantitative analysis of current market and estimations through 2016-2022, that assist in identifying the prevailing market opportunities to capitalize on the global offshore mooring market. It has outpaced the conventional technology of temporary anchors by use of synthetic mud ropes, which has now become a standard in oil & gas industry. On the basis of mooring type segment, the market is further subsegmented into catenary mooring, taut leg mooring, semi-taut mooring, spread mooring, single point mooring, and dynamic positioning mooring system.

Key market segmentsThe market is segmented on the basis of pumping system, chemicals, membrane systems, and geography. By Geography, it is analyzed across North America, Europe, Asia-Pacific, and LAMEA.Delmar SystemsKTL Offshore Pte Ltd. The emergence of this technology has addressed the soaring needs for Floating Production Storage & Offloading (FPSOs) and production facilities in deep water and ultra-deep water projects. However, high initial CAPEX, harsh deep sea environmental conditions could limit the growth of the market.

This growth is attributed to increased demand for energy across the globe that has resulted in increased subsea exploration and production. On the basis of applications, the market is further segmented into floating production storage & offloading (FPSO) vessels, floating drilling production storage and offloading (FDPSO) vessels, floating liquefied natural gas (FLNG) vessels, tension leg platform (TLP), SPAR platforms, semi-submersibles, and others (conductor support systems, fixed platform and compliant towers). Moreover, the rise in offshore field exploration has boosted the offshore mooring market.V.This report provides the quantitative analysis of the current market and estimations through 2014-2022 to identify the prevailing market opportunities.